Soft-Story Seismic Retrofit in Beverly Hills

Cal Retrofit brings Beverly Hills soft-story buildings into compliance with the city's mandatory retrofit ordinance, engineering through certification.

The requirement

Retrofit is required in Beverly Hills.

Beverly Hills Seismic Retrofit Program (Ordinance 18-O-2767)

Beverly Hills adopted Ordinance 18-O-2767, its mandatory seismic retrofit program, effective January 11, 2019. The city identified roughly 300 wood-frame buildings with soft, weak, or open-front ground floors and required owners to strengthen them on a tiered schedule.

Those compliance deadlines have now passed, with the final tier due July 6, 2023, so any un-retrofitted building is past due. Cal Retrofit manages the full path: a screening form prepared by a licensed professional, structural engineering with our sister company Naxa, steel moment frames and reinforcement, permits, and final certification.

What we install

The Beverly Hills retrofit scope.

  • 01 · Scope

    Steel moment frames at the open-front bay

  • 02 · Scope

    Cantilever columns where moment frames are infeasible

  • 03 · Scope

    Shear wall reinforcement at perimeter and interior walls

  • 04 · Scope

    Hold-downs, drag beams, and structural anchoring

  • 05 · Scope

    Concrete footing or grade-beam work as required

How a Beverly Hills project runs

Six steps from free survey to closeout.

  1. 01

    Free property survey

    100% free property survey, inspection, and measurement. We walk the building, document conditions, and tell you exactly what compliance requires.

  2. 02

    Engineering and plans

    Our engineering partner Naxa prepares architectural and structural plans, sealed and ready for plan check.

  3. 03

    Tenant notifications

    Tenant Habitability Plan and HCID-LA notifications prepared and filed. We handle every required disclosure.

  4. 04

    Construction begins

    Crews mobilize with all materials, labor, and equipment. Documented quality control. Daily field logs.

  5. 05

    City inspection

    Coordination with Department of Building and Safety inspectors. We schedule the inspections and resolve any callouts.

  6. 06

    Tenant cost-sharing

    Up to half of qualifying retrofit cost can be passed to tenants over ten years, coordinated through HCID-LA approval.

Beverly Hills retrofit questions

Straight answers for Beverly Hills owners.

Is soft-story retrofit mandatory in Beverly Hills?
Yes. Beverly Hills Ordinance 18-O-2767, effective January 11, 2019, requires owners of designated soft-story buildings to complete a seismic retrofit. All compliance tiers have passed, so un-retrofitted buildings are now past due.
My Beverly Hills building is not retrofitted yet. What now?
The deadlines have passed, so the building is out of compliance and exposed to enforcement and liability. The fastest path is a structural assessment and an expedited retrofit. Cal Retrofit handles the screening form, engineering, permits, and construction.

Get a real number

Free Beverly Hills site assessment. Written estimate. No pressure.