Cal Retrofit | Engineering, Construction, Management

Seismic Retrofit · Culver City

Soft-Story Seismic Retrofit in Culver City

Cal Retrofit brings Culver City soft-story buildings into compliance with the city's mandatory retrofit program, from engineering through final certification.

The requirement

Retrofit is required in Culver City.

Culver City SWOF Retrofit Program (Ordinance 2021-013)

Culver City adopted Ordinance 2021-013, its mandatory soft, weak, or open-front (SWOF) retrofit program, on September 27, 2021, and began sending owner notices in October 2023. It requires owners of qualifying wood-frame buildings to strengthen the weak ground-floor story.

Cal Retrofit manages the full Culver City path: a screening report, structural engineering with our sister company Naxa, steel moment frames and shear-wall reinforcement, permit coordination, and final certification.

What we install

The Culver City retrofit scope.

  • 01 · Scope

    Steel moment frames at the open-front bay

  • 02 · Scope

    Cantilever columns where moment frames are infeasible

  • 03 · Scope

    Shear wall reinforcement at perimeter and interior walls

  • 04 · Scope

    Hold-downs, drag beams, and structural anchoring

  • 05 · Scope

    Concrete footing or grade-beam work as required

How a Culver City project runs

Six steps from free survey to closeout.

  1. 01

    Free property survey

    100% free property survey, inspection, and measurement. We walk the building, document conditions, and tell you exactly what compliance requires.

  2. 02

    Engineering and plans

    Our engineering partner Naxa prepares architectural and structural plans, sealed and ready for plan check.

  3. 03

    Tenant notifications

    Tenant Habitability Plan and HCID-LA notifications prepared and filed. We handle every required disclosure.

  4. 04

    Construction begins

    Crews mobilize with all materials, labor, and equipment. Documented quality control. Daily field logs.

  5. 05

    City inspection

    Coordination with Department of Building and Safety inspectors. We schedule the inspections and resolve any callouts.

  6. 06

    Tenant cost-sharing

    Up to half of qualifying retrofit cost can be passed to tenants over ten years, coordinated through HCID-LA approval.

Culver City retrofit questions

Straight answers for Culver City owners.

Is soft-story retrofit mandatory in Culver City?
Yes. Culver City Ordinance 2021-013, adopted in 2021, requires owners of designated wood-frame soft-story buildings to complete a structural retrofit within five years of the city's notice.
Which Culver City buildings are covered?
Wood-frame buildings with a construction permit filed before October 23, 1978, that have a ground floor or basement with parking or open space creating a weak wall line and at least one story above. Detached single-family homes are excluded.

Get a real number

Free Culver City site assessment. Written estimate. No pressure.