Cal Retrofit | Engineering, Construction, Management

Seismic Retrofit · Santa Monica

Soft-Story Seismic Retrofit in Santa Monica

Cal Retrofit brings Santa Monica soft-story buildings into compliance with the city's mandatory retrofit program, from engineering through final sign-off.

The requirement

Retrofit is required in Santa Monica.

Santa Monica Mandatory Seismic Retrofit Program (Municipal Code Chapter 8.72)

Santa Monica adopted one of the most comprehensive mandatory seismic retrofit programs in the region in 2017, codified in Municipal Code Chapter 8.72. The city inventoried roughly 1,700 soft-story wood-frame buildings and issued orders requiring owners to retrofit them.

Most Santa Monica completion deadlines fell in 2025, so many buildings are now at or past their required date. Cal Retrofit takes owners through the full path: structural engineering with our sister company Naxa, steel moment frames and shear-wall reinforcement, permit coordination, and final certification.

What we install

The Santa Monica retrofit scope.

  • 01 · Scope

    Steel moment frames at the open-front bay

  • 02 · Scope

    Cantilever columns where moment frames are infeasible

  • 03 · Scope

    Shear wall reinforcement at perimeter and interior walls

  • 04 · Scope

    Hold-downs, drag beams, and structural anchoring

  • 05 · Scope

    Concrete footing or grade-beam work as required

How a Santa Monica project runs

Six steps from free survey to closeout.

  1. 01

    Free property survey

    100% free property survey, inspection, and measurement. We walk the building, document conditions, and tell you exactly what compliance requires.

  2. 02

    Engineering and plans

    Our engineering partner Naxa prepares architectural and structural plans, sealed and ready for plan check.

  3. 03

    Tenant notifications

    Tenant Habitability Plan and HCID-LA notifications prepared and filed. We handle every required disclosure.

  4. 04

    Construction begins

    Crews mobilize with all materials, labor, and equipment. Documented quality control. Daily field logs.

  5. 05

    City inspection

    Coordination with Department of Building and Safety inspectors. We schedule the inspections and resolve any callouts.

  6. 06

    Tenant cost-sharing

    Up to half of qualifying retrofit cost can be passed to tenants over ten years, coordinated through HCID-LA approval.

Santa Monica retrofit questions

Straight answers for Santa Monica owners.

Is soft-story retrofit mandatory in Santa Monica?
Yes. Santa Monica's mandatory seismic retrofit program, under Municipal Code Chapter 8.72 adopted in 2017, requires owners of designated soft-story buildings to complete a structural retrofit. Most completion deadlines fell in 2025, so many buildings are at or past their deadline.
What if my Santa Monica building is past its deadline?
If your building has not been retrofitted and its deadline has passed, it is out of compliance and exposed to enforcement, liability, and insurability problems. Cal Retrofit can assess the building and move quickly to bring it into compliance.

Get a real number

Free Santa Monica site assessment. Written estimate. No pressure.