Cal Retrofit | Engineering, Construction, Management

S01 · Service

Mandatory soft-story seismic retrofit

Soft-story buildings, meaning wood-frame multifamily with open parking or tuck-under garage at ground level, fail first in major earthquakes. Los Angeles and an expanding list of California cities require retrofit on enforceable timelines.

Who this is for

Seismic retrofit

Owners of soft-story multifamily, mixed-use, and tuck-under-parking buildings subject to mandatory retrofit.

Plan check coordination, steel moment frames, cantilever columns, shear wall reinforcement, and final certification.

When ground shaking starts, soft-story buildings fail first. Retrofit converts a known structural liability into a code-compliant, insurable building.

Seismic retrofit, Cal Retrofit field reference

What's in scope

What Cal Retrofit delivers on a seismic retrofit project.

  • 01 · Scope

    Steel moment frames at the open-front bay

  • 02 · Scope

    Cantilever columns where moment frames are infeasible

  • 03 · Scope

    Shear wall reinforcement at perimeter and interior walls

  • 04 · Scope

    Hold-downs, drag beams, and structural anchoring

  • 05 · Scope

    Concrete footing or grade-beam work as required

What it gets you

The business case.

  • Lower earthquake insurance premiums on the upgraded structure

  • Reduced liability exposure if an event occurs

  • Insurability and refinanceability protected

  • Tenant cost-sharing of up to 50% over 10 years approved through HCID-LA

  • Higher occupancy and rent on a code-compliant building

Where it applies

Mandatory ordinance cities.

  • Los Angeles Soft-Story Ordinance
  • Santa Monica
  • West Hollywood
  • Pasadena
  • Culver City
  • Long Beach
  • Beverly Hills

How a project runs

Six steps from free survey to closeout.

  1. 01

    Free property survey

    100% free property survey, inspection, and measurement. We walk the building, document conditions, and tell you exactly what compliance requires.

  2. 02

    Engineering and plans

    Our engineering partner Naxa prepares architectural and structural plans, sealed and ready for plan check.

  3. 03

    Tenant notifications

    Tenant Habitability Plan and HCID-LA notifications prepared and filed. We handle every required disclosure.

  4. 04

    Construction begins

    Crews mobilize with all materials, labor, and equipment. Documented quality control. Daily field logs.

  5. 05

    City inspection

    Coordination with Department of Building and Safety inspectors. We schedule the inspections and resolve any callouts.

  6. 06

    Tenant cost-sharing

    Up to half of qualifying retrofit cost can be passed to tenants over ten years, coordinated through HCID-LA approval.

Get a real number

Free site assessment. Written estimate. No pressure.