Cal Retrofit | Engineering, Construction, Management

S03 · Service

ADUs, delivered by our sister companies

Cal Retrofit does not lead ADU design and delivery. Our sister companies do: ADU Concepts for single-family and multifamily ADUs, and LyteMods for panelized light-gauge-steel ADU homes. Where an ADU pairs with retrofit, foundation, or waterproofing work, Cal Retrofit performs the structural and permitting support on the same lot and hands the ADU build to the right sister company.

Who this is for

ADUs, through our sister companies

Property owners exploring an accessory dwelling unit alongside compliance or foundation work.

A direct handoff to ADU Concepts and LyteMods, plus the structural, foundation, and permitting support Cal Retrofit already performs on the same lot.

ADUs are the fastest, most reliable way to add legal housing to an existing lot in California. Our family of companies covers the whole path.

ADUs, through our sister companies, Cal Retrofit field reference

Who leads ADUs

For a dedicated ADU, start with our sister companies.

Cal Retrofit handles the structural, foundation, and permitting support where an ADU pairs with retrofit work on the same lot. ADU design and delivery is led by the TESH Group companies below.

What's in scope

What Cal Retrofit delivers on a adus, through our sister companies project.

  • 01 · Scope

    Direct handoff to ADU Concepts and LyteMods

  • 02 · Scope

    Foundation and structural support on the lot

  • 03 · Scope

    Permit coordination alongside any compliance work

  • 04 · Scope

    Site review and feasibility with the sister-company team

What it gets you

The business case.

  • One family of companies for compliance, foundation, and ADU work

  • Structural, foundation, and permitting support from Cal Retrofit

  • Dedicated ADU design and delivery from ADU Concepts and LyteMods

  • Hybrid and panelized options for faster delivery

Where it applies

Mandatory ordinance cities.

  • ADU Concepts: single-family and multifamily ADUs across California
  • LyteMods: panelized light-gauge-steel ADU homes

How a project runs

Six steps from free survey to closeout.

  1. 01

    Free property survey

    100% free property survey, inspection, and measurement. We walk the building, document conditions, and tell you exactly what compliance requires.

  2. 02

    Engineering and plans

    Our engineering partner Naxa prepares architectural and structural plans, sealed and ready for plan check.

  3. 03

    Tenant notifications

    Tenant Habitability Plan and HCID-LA notifications prepared and filed. We handle every required disclosure.

  4. 04

    Construction begins

    Crews mobilize with all materials, labor, and equipment. Documented quality control. Daily field logs.

  5. 05

    City inspection

    Coordination with Department of Building and Safety inspectors. We schedule the inspections and resolve any callouts.

  6. 06

    Tenant cost-sharing

    Up to half of qualifying retrofit cost can be passed to tenants over ten years, coordinated through HCID-LA approval.

Get a real number

Free site assessment. Written estimate. No pressure.