Cal Retrofit | Engineering, Construction, Management

S02 · Service

SB-721 and SB-326 balcony repair and recertification

California's Exterior Elevated Element (EEE) laws, SB-721 (multifamily, Civil Code §5551) and SB-326 (HOA-managed, Civil Code §5986), require inspection and repair of balconies, decks, stairways, walkways, and elevated entries. SB-326 first inspection was due January 1, 2025, then every nine years. SB-721 is due January 1, 2026 under AB 2579, then every six years. Cal Retrofit is the licensed contractor that executes the repair and recertification; licensed inspection reports are handled with our engineering partner Naxa.

Who this is for

Balcony repair and recertification

Multifamily owners (SB-721) and HOAs (SB-326) with balconies, decks, stairways, walkways, or elevated entry structures that need repair or recertification.

Repair scope, structural remediation, waterproofing, permit coordination, and certified repair execution. Licensed inspection reports handled with our engineering partner Naxa.

Missing the deadline means fines, insurability issues, and personal exposure if an element fails. One vendor for the repair-through-recertification chain.

Balcony repair and recertification, Cal Retrofit field reference

What's in scope

What Cal Retrofit delivers on a balcony repair and recertification project.

  • 01 · Scope

    Repair scope developed from the inspection report

  • 02 · Scope

    Structural remediation of deteriorated exterior elevated elements

  • 03 · Scope

    Waterproofing: flashings, membranes, coatings, and sealants

  • 04 · Scope

    Permit pull and city coordination

  • 05 · Scope

    Repair execution by licensed crews

  • 06 · Scope

    Recertification and re-inspection scheduling

What it gets you

The business case.

  • One vendor for repair, waterproofing, and recertification

  • Structural remediation by a licensed general contractor

  • Liability protection once an element is repaired and recertified

  • Insurance carrier compliance documentation

Where it applies

Statewide California requirement.

  • All California multifamily rental buildings, three or more units (SB-721)
  • All California HOA and condominium buildings (SB-326)

How a project runs

Six steps from free survey to closeout.

  1. 01

    Free property survey

    100% free property survey, inspection, and measurement. We walk the building, document conditions, and tell you exactly what compliance requires.

  2. 02

    Engineering and plans

    Our engineering partner Naxa prepares architectural and structural plans, sealed and ready for plan check.

  3. 03

    Tenant notifications

    Tenant Habitability Plan and HCID-LA notifications prepared and filed. We handle every required disclosure.

  4. 04

    Construction begins

    Crews mobilize with all materials, labor, and equipment. Documented quality control. Daily field logs.

  5. 05

    City inspection

    Coordination with Department of Building and Safety inspectors. We schedule the inspections and resolve any callouts.

  6. 06

    Tenant cost-sharing

    Up to half of qualifying retrofit cost can be passed to tenants over ten years, coordinated through HCID-LA approval.

Get a real number

Free site assessment. Written estimate. No pressure.